Steam turbine power lab system

Order Code: 25268993.1

Category: General Lab Equipment V

Steam turbine power lab system



SPECIFICATION

Steam turbine power lab system

  1. Electrical powered boiler, steam turbine and condenser, all mounted on a mobile frame.
  2. The boiler’s efficiency must be measurable.
  3. Steam must drive a turbine whose generated power is quantifiable through a dynamometer or an alternator.
  4. The condenser’s efficiency must be measurable.
  5. Control the power output of turbine by using dynamometer
  6. Steam turbine power plant must have be able to gather and record the following data:
  7. Electrical power consumption by oiler for feed water
  8. Boiler temperature out
  9. Boiler pressure out
  10. Turbine inlet and outlet pressure
  11. Turbine inlet and outlet temperature
  12. Turbine RPM
  13. Generator current (amps) output
  14. Generator voltage output
  15. Condenser inlet and outlet temperatures
  16. Condenser inlet pressure
  17. Software capable of capturing and storing the data listed in requirement #6 must be supplied.
  18. All software/sensors must come calibrated and ready to use.
  19. Lab equipment must be no bigger then 65”L x 34”W x 60”H inches
  20. Lab equipment must not weight more than 500 lbs and can easily be moved by 2 people.
  21. Power:120 VAC 50/60Hz or 220 VAC  single phase 50/60 Hz
  22. The equipment must be CSA certified or certified to CSA standard SPE-1000
     